All-Time Low Swiss Hydro Reservoirs

Swiss Reservoir
Product
Jan. 27, 2017EYLERT ELLEFSEN

Critical levels can be reached this winter.

In our blog of January 16th, we focused on the very low hydrological balance across the CWE region. The hydrological deficit is still about 20 TWh lower than normal which may result in nearly 5000 MW reduced hydropower (- 25%) during May-July.

In this blog post, we will focus on the hydropower situation in Switzerland. Switzerland relies on 65% of their power supply from hydropower, and this winter the supply situation can be threatened if additional nuclear capacity does not come online during February. The hydro reservoirs are at all-time low levels and are forecasted to decline even stronger the next weeks to come, see chart below.

Reservoir filling Switzerland 2000-2017

The chart from Medium term/reservoirs from the hydrology section at Wattsight underlines the current situation. In this chart, you see forecasted Hydro-reservoir curve during the summer until the end of the year. The forecasted levels weeks 13 – 15 are extremely low, and maybe it is not possible to force the reservoirs that low. Thus we have made some scenarios with different production strategies and also checked the power balance and the introduction of additional nuclear capacity by mid-February (Leibstadt – 1200 MW).

Medium Term - Reservoir Forecast Jan 2017

Hydro Reservoir Scenarios

We have made a High and a Low reservoir scenario in addition to the Base scenario displayed on Wattsight (see above).

In the High scenario, we adjust the reservoirs not to come lower than earlier minimum levels by weeks 13-15 (7%), while we in the Low scenario have lowered the reservoir curve to reach statistical minimum level by Sept 1st. Scenario High means reduced production until week 15 compared to the Base scenario. Scenario Low means slightly higher production during summertime.

Hydroreservoir Switzerland until sept.

Production curves come out as displayed in the chart below:

Production Switzerland - weekly until sept 2017

We see very clearly that whatever reservoir scenario will occur, the Swiss hydropower production has to be reduced significantly during February to avoid unacceptable low reservoir levels. Production has to be reduced further by about 50 % from today’s level. During the summer period, the production has to be reduced by about 25% compared to a normal situation as current hydrological balance is about – 6.5 TWh.

Detailed studies of the power balance show that start-up of the nuclear plant Leibstadt (1200 MW) announced for week seven can not be further delayed if the country wants to avoid problems with their power supply. It was a difficult supply situation last year too, but then the situation was partly saved by mild and wet weather during January/February. The current situation, however, is already worse than 2016.

Wattsight will continue to update you on the Swiss situation. We update our reports daily, and we are going to publish new blog stories as soon as we new information during February is available.

Eylert Ellefsen

Head of Continental Analysis


RETURN TO BLOG